Construction Administration

Project: St Mary on the Lake Boiler Replacement & Alterations
Client: Sisters of St Joseph of Peace
Contact: Mr. Lee Stanton; Stanton Associates (206) 725 – 4272
Description: Coles Consultants L.L.C. prepared Mechanical and Electrical Contract Drawings for this project.  This project replaced a central boiler with individual boilers in four buildings.  David M. Coles PE provided construction administration on this project which included attending regular meetings, reviewing submittals, answering field questions, preparing and back checking punch lists, and witnessing startup, testing, and commissioning of boilers, pumps, and appurtenances.
Status: As of May 2010 three of four buildings have been completed and the remaining building is scheduled to be completed in August 2010.    

Project: North Mercer Pump Station Chemical Injection System
Client: King County Department of Natural Resources and Parks Waste Water Treatment Division
Contact: Mr. Pierre LaRochelle; Project Representative (206) 263 – 3207
Description: Mechanical and Electrical Contract documents were prepared by Coles Consultants L.L.C in Year 2004 and were advertised for bidding in Year 2009.  This project included a chemical storage tank, metering pumps, distribution piping, and instrumentation.  David M. Coles PE provided services during construction that included attending regular meetings, reviewing submittals, answering field questions, and preparing and back checking punch lists.
Status: Substantial completion was achieved in May 2010. 

Project: Central Plant Expansion
Client: Highline Medical Center Burian, WA
Contact: Mr. Dan Duncan TAC Americas, Inc. (214) 763 – 7905
Description: TAC Americas, Inc. prepared the Contract Mechanical and Electrical Documents for upgrades to the existing Hospital Central Plant.  David M. Coles PE was hired by TAC Americas, Inc. to provide Construction Administration for this project.  This project required relocation of an existing 900 KW Engine/Generator that As – Built information on remote monitoring and remote start were not available.  David M. Coles PE prepared As – Built information from information obtained in the field.  Mr. Coles also included Construction Administration including periodic site visits, preparing and back checking punch lists, answering field questions, reviewing change orders, participating in electrical shut downs, and other duties as assigned.
Status: Substantial completion was achieved in August 2009. 

Project: Four Seasons Hotel Seattle, WA
Client: Seattle Hotel Group
Contact: Mr. Jayson Gilliam TAC Americas, Inc. (972) 323 – 5452  
Description:
David M. Coles PE was hired by TAC Americas, Inc. to provide Construction Administration for this project.  TAC Americas, Inc. prepared the Contract Electrical Documents for this new construction project.  Construction Administration included weekly site visits, preparing and back checking punch lists, answering field questions, reviewing change orders, and other duties as assigned.
Status: Mr. Coles work was completed in January 2009 

Project: Dean Hall Renovation
Client: Central Washington University Ellensburg, WA
Contact: Mr. Jayson Gilliam TAC Americas, Inc. (972) 323 – 5452
Description: David M. Coles PE was hired by TAC Americas, Inc. to provide Construction Administration for this project.  TAC Americas, Inc. prepared the Contract Electrical Documents for this project.  Construction Administration included monthly site visits, preparing and back checking punch lists, answering field questions, reviewing change orders, and other duties as assigned.
Status: Mr. Coles work was completed in January 2009